Hi guys!
My Dutch is quite poor, I hope that you can forgive me if I ask my question in English.
Before I fix my roof to hold bigger solar panel installation, I have decided to place few solar panels in other places (front and back tool shed with flat roof). Those solar panels will be connected to groups with other devices connected.
- I do understood that I need to stay below 600W production per each group.
- my plan is to get APS DS3-l microinverter plus two panels 330W (solar panels will be placed on flat surface - not optimal angle). On top of that I would buy APS cable with L/N/GND to connect to the grid.
- do I need to put some kind of fuse etc. between microinverter and connection to the grid?
- do I need to inform my electricity provider?
- do I need to get electrician to confirm everything is OK, to avoid any discussion with insurance company in case of fire etc.?
Thanks in advance for help!
Tom
My Dutch is quite poor, I hope that you can forgive me if I ask my question in English.
Before I fix my roof to hold bigger solar panel installation, I have decided to place few solar panels in other places (front and back tool shed with flat roof). Those solar panels will be connected to groups with other devices connected.
- I do understood that I need to stay below 600W production per each group.
- my plan is to get APS DS3-l microinverter plus two panels 330W (solar panels will be placed on flat surface - not optimal angle). On top of that I would buy APS cable with L/N/GND to connect to the grid.
- do I need to put some kind of fuse etc. between microinverter and connection to the grid?
- do I need to inform my electricity provider?
- do I need to get electrician to confirm everything is OK, to avoid any discussion with insurance company in case of fire etc.?
Thanks in advance for help!
Tom