Toch een prestatie op zich, ik was alleen lui, geen verhaaltje
edit:
Ik ben trouwens benieuwd naar komende maand. Er lopen 2 projecten (hoogstwaarschijnlijk) af in oktober.
Zie ook:
http://www.worldcommunity...search/viewAllProjects.do
Wat gaat er komen nadat UGM en MCM aflopen? Benieuwd of er al iets op stapel staat of dat we een tijdje daadwerkelijk minder projecten hebben zoals andere jaren
Post Sgt. Joe op WCG forums
Last 30 day average results:506,255
Estimated end date using 30 day average: October 5, 2016
Percent Complete:98.91449%
The average length of a WU is currently running about 4.09 hours, slightly longer than last week, and still trending steady around the 4 hour mark. The trend line for the past few weeks has been for the workunits to be ever so slightly shorter on average and this week they were slightly longer again.
Still have not seen any of the batches from 122278 to 122402. The ovarian units started with 122403 as the lowest number.My latest batch number was 126272 which would give about 178 batches for the week. Therefore, by this measure the project is about 98.67% complete. (Take this number with a large grain of salt, but it is now the same number as displayed on the research page ).
We are still at about .38 more months (approx. 11 days)of additional crunching at the current recent run rate. The projected completion date has held steady all week for the previous three weeks. Production increased a bit this past week going from about 3.4 million WU's to 3.52 million WU's completed. During this past week the time devoted to MCM1 was just under an average of 233 years per day, compared to 225 years per day the previous week. Getting back to about 3.5 million work units or more per week will move that completion date closer. Remember, the situation can change at any time and these are only estimates.
De verwachting is dat UGM ongeveer 26 dagen nog door kan draaien zodra MCM eindigt, we gaan het zien
[
Voor 90% gewijzigd door
Suicyder op 28-09-2016 08:21
]